European Data Centre

Phoenix successfully completes the second phase of a new Data Centre in Germany.

2007 Phase 1 was for the installation of 33 Racks and the installation, termination and testing of 3168 OM3 fibre optic (LC) terminations and 6336 Category 6 outlets. Phase 1 was completed in three weeks.

2008 Phase 2 was for the expansion of 18 Racks and the installation, termination and testing of 1728 OM3 fibre optic (LC) terminations and 3456 Category 6 circuits. Phase 2 was completed in three weeks.

Included in Phase 2 was the implementation of SAN Refresh and DWDM expansion.

2009 Role on Phase 3