In 2008 work began on the construction and reconfiguration of Felixstowe South terminal creating 1,300m of quay served by 13 new ship-to-shore gantry cranes. The new terminal has 750m of sea wall and has a clearance of 16m with gantries suited for extra large box carriers.
In September 2010, working alongside the main electrical Contractor Phoenix Optics installed over 16 km of singlemode fibre optic cable externally into new and existing cable ducts. 3 km of OM3 multimode fibre optic cable was also installed and over 3,000 pigtails were fusion spliced and tested.
The new fibre optic cable infrastructure was installed to integrate the new harbour to the existing dock authority network.
![]() ![]() ![]() |